Current Projects
1 : : United Tower At Pearl Qatar

United Tower is located at Parcel 7A 345 West Port drive at The Pearl Qatar being developed by United Development Co. (UDC). The Tower consists of four levels of Car parking for 312 cars, Mezzanine floor, Amenity floor and 20 levels of Apartments. Residential Units total 162 Nos. within the tower shall have all the amenities inclusive of swimming pools, spa, community room etc. The Tower consists 04 luxury Penthouses at the top floors.


2 : : Multi Product Pipeline from Qatar Petroleum to NODCO

Project of 18" Multi product pipeline from QP refinery to doha depot (Abu Hamour) of Qatar Petroleum.  The prime function of this project is to deliver additional supply of Multi-Products (Diesel, Petrol & Jet- A Fuel) to meet the countries infrastructure development.

GCC Scope of Work involves:

  • CIVIL Works for EPIC Multi-Product Pipeline from QP Refinery to Doha Depot at 4 Locations (QP Refinery, ELA, BSV-3 & Doha Depot).
  • Building works – 11KV Substation, Satellite Equipment Building (4NOS), Pump House, Gate House(2no’s). Pig Launchers etc.
  • Pipeway culverts- 12nos, Pipe sleepers & supports - 840nos, UG Sump tanks & Asphalt Road works – 14,000 Sq.m
  • 500 Tones of Structutal Steel Works for Emergency Loading shed, Pump house, Substation, Foam Trailer sheds, Vapour compressor shed , Sleepers / Support Foundation & Pipe Cross Overs/Platforms.

3 : : Four Star Hotel Project - Qatar Airways
  • The 4 Star Airport Hotel, is a 400 Room Hotel, is located near the existing Doha Airport. Approximate Gross Built-Up Area is 43,135 M2 and the development consists of Basement, Ground and First Floor plus two 6-Storey towers (B+G+7).
  • Basement (7048 M2) is for Car Park & Plant Room
  • The Ground Floor to include Front Office, Foyer, Lobby Lounge, Retail, Shops, Restaurants, Administration,Loading Dock & Back of Houses. 
  • The First Floor is to include Restaurant, Lounge, Meeting Rooms, Business Centre, Health Club and Swimming Pool.
  • Above First Floor there are 6 Floors dedicated to the Guest Rooms (400 Rooms).

4 : : Doha West Sewage Treatment Plant Extension No.3

Marubeni corporation / Degremont Joint Venture is the main contractor.

Gulf Contracting W.L.L has been appointed as civil contractor to the Marubeni Corporation to deliver the structural, MEP and finishing scope of works.

The project has included 30000M3 of structural concrete comprising of over 30 independent structures, 40000M3 of excavation works to construct two surface lagoons and spillways.

17km of new security fencing, 10km of deep excavation pipelines and chambers, 7km of handrailing & over 60000M2 of concrete protection works.